Loading Optiwise
Loading Optiwise
Follow a custom engineering order through its specification, materials, machining, outsourced work and inspection in Optiwise.

Concept illustration, not a product screen or customer result.
We connect the customer enquiry, quotation, accepted order and manufacturing work. Item records can hold drawings, specifications and related attachments. The quotation and order timeline retain the commercial context needed when a customer changes a quantity or technical requirement.
For engineering work, the handover needs more than an item name. Keep the relevant drawing reference, material grade, unit and required delivery alongside the order and job. A new attachment should lead to a deliberate review of the affected work, rather than an assumption that every released job now has the right instruction.
Imagine an illustrative order for 120 brackets whose drawing changes before the outside finishing step. The planner checks the instruction on the active job, identifies the affected quantity and assigns the technical clarification. Purchasing and the subcontract owner use the agreed specification for any remaining vendor work.
Optiwise supports BOMs and routing with in-house, subcontracted, quality and assembly steps. Keep the service order, material delivery challan and returned quantity connected to the chosen route. If only part of the requirement goes outside, follow the allocated and remaining quantities instead of duplicating the entire requirement.
A vendor returning 80 pieces does not settle a 120-piece requirement. Inspect the returned work under the configured process, distinguish accepted output from rework or rejection, and review the material still held outside. Extra material sent to the vendor must stay visible beside the original issue.
If the vendor's returned specification does not match the agreed revision, the responsible technical and quality people decide the disposition. A document attachment provides context; it is not an automated engineering decision about whether a changed part is safe or suitable.
Bring the enquiry, accepted quotation, drawing and one partly completed job. We can follow the production record, outside processing and the inspection decision. Our connected system keeps the order, people and next action in view without asking each department to reconstruct the history.
Keep the order and drawing reference together.
Review the affected operation and quantity.
Follow the service order, material issue and partial return.
Record the inspection and remaining requirement before dispatch.
Item masters support drawings and attachments, and operational records carry the relevant document context. Review the drawing used by the released job when the customer changes a specification.
Yes. Production supports in-house and subcontract allocation, with quantities and corresponding job or service-order work. Keep the material dispatch and return linked to the outside allocation.
Your technical and quality responsibilities remain essential. Review the affected records, instruction and inspection requirement before continuing or accepting the changed work.
Bring the records behind one everyday exception. We will follow the work, the responsible people and the next decision in Optiwise.